- Overall Size: 68"L x 27"W x 30"H
- Chair: 40" L x 27" W x 38 H
- Seat: 21" W x 21" L
- Depth: 20.5"
- Armrest: back 2" - 3.5" front widest area
- Armrest Height: 23.5"
- Footrest: 21" W x 28"L x 14.5" H
- Maximum Recommended Weight: 400 lbs.
- Optional Seat & Back Cushion: Requires 4 Yards of Fabric for COM
- Add 20% yardage for striped or patterned fabric
- Weight: 39 lbs
- Materials: 100% Grade A Plantation Teak
- Cushion yardage: Adirondack Outdoor Footstool Cushion: 1 x 1.75 yards ' (optional)'
- Adirondack Footrest: 1 x 1.75 yards
- Teak Adirondack Lounger: 1 x 2.75 yards
- Adirondack Outdoor Back and Seat Cushion: 1 x 2.75 yards ' (optional)'
- Total: 4.5 yards.
- Floor Protection: Adirondack Footrest: Glides
- Teak Adirondack Lounger: Glides
- Assembly: Some Assembly
- Umbrella Ready: No
- Warranty: Lifetime warranty
Westminster Teak Adirondack Lounger and Ottoman
SKU 70000
$2,178.00
Have a question?
Not sure where to start? Schedule a free consultation and we'll break it down